Flag of Spain

Software Development Company for Spanish Businesses

Two separate obligations, two separate timetables, and almost everybody confuses them.

Working With Spain

Spain is introducing two different invoicing obligations on two different timetables, and they are regularly treated as one thing. One governs how your software generates and records an invoice, meaning it cannot be quietly altered afterwards. The other governs how invoices are exchanged between businesses. A system can satisfy one and be nowhere near the other, which is why the first useful step is telling them apart.

The two obligations, and why the distinction matters.

One Is About Your Software’s Behaviour

The Other Is About Exchange

The Dates Have Already Moved Once

Start with a Call

  • Pricing depends on the project scope
  • Invoiced in USD, EUR or GBP
  • You own the source code

The parts that apply across the whole bloc, meaning VAT between member states, data protection and the move to EU wide e-invoicing, are set out on Software Development Company for EU Businesses.

What Spain Companies Ask Us to Build

What Spanish companies ask us to build.

Invoice Records That Cannot Be Altered

Created in sequence and held so a later change is a new record and not a quiet edit of the old one.

Structured Invoice Exchange

Sending and receiving business to business invoices as data instead of as documents, with the receiving half treated as seriously as the sending.

Tourism and Hospitality Operations

Capacity, seasons and staffing for businesses whose year is concentrated into particular months.

Agriculture and Food Export Systems

Harvest, grading and consignment records where the product has a clock and a destination.

Logistics and Distribution Tools

Receiving, picking and despatch recorded as it happens so the figure is right when somebody commits.

An Application Nobody Maintains

A system the business depends on that nobody can modify. We read it before saying what should happen to it.

Selected References

Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.

National Education Foundation

National Education Foundation

Education Foundation

Kurtsan

Kurtsan

Wheel Hub Industry

Floorwise

Floorwise

Commercial and Residential Flooring

Toptanfactory

Toptanfactory

Wholesale Marketplace

Structy

Structy

Civil Engineering

From First Call to Project Start

The same five steps wherever you are. You can stop after any of them.

1

Short Call

15 Minutes

You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.

2

Technical Review

45-60 Minutes

We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.

3

Scope Document

Before Any Contract

What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.

4

Build and Preview

From Week One

A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.

5

Handover and Support

On Completion

The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.

Choosing a Firm From Spain

What to settle before touching the system that produces your invoices.

Records Are Appended, Not Edited

A correction becomes a new record that references the old one. Systems that update a row in place cannot demonstrate what the original said, and that is the whole point of the requirement.

Receiving Matters as Much as Sending

Most of the saving is in reading a supplier invoice automatically and matching it to an order. Firms that build only the sending half do the obligation and skip the benefit.

Dates Live in Settings

These timetables have already changed once. Which rules apply from when belongs where your own team can adjust them.

The Current Code Is Reviewed

Where a system already issues invoices, the review says whether it can meet these without the data model changing first.

Your Account Holds the Infrastructure

Opened in your name, in a region you choose. You hold the billing and the keys.

The Engineer Who Built It Answers

Not a ticket queue. You do not explain the situation from the beginning every time you write.

Questions Spanish Clients Ask

Confusing these two obligations costs money in a specific way. A business spends its budget on the exchange side, because that is the visible one that customers notice, and then discovers that the requirement reaching into how its software stores a record was the one with teeth. The two are genuinely separate problems with separate solutions, and the half hour spent establishing which one you are actually facing is the most valuable half hour in the project.

A Fifteen-Minute Call Is Enough to Start

Work out which of the two obligations you are facing before anybody quotes for either.

Get a Quote
© 2024-2026 Codefacture Yazılım A.Ş.All Rights Reserved
Get a Quote

We reply the same working day