Flag of Germany

Software Development Company for German Businesses

From January 2027 a German company above the threshold has to issue structured invoices, not PDFs.

Working With Germany

Germany is partway through a change that touches every system producing an invoice. Since 2025 a business has had to be able to receive a structured electronic invoice. From January 2027 companies above the revenue threshold have to issue them as well, and from 2028 everybody does. A PDF attached to an email stops counting as an invoice, which is a software problem long before it is a tax problem.

What the e-invoicing obligation actually asks of a system.

A Structured File, Not a Document

The Dates Are Already Set

Buyers Here Read the Specification

Start with a Call

  • Pricing depends on the project scope
  • Invoiced in USD, EUR or GBP
  • You own the source code

The parts that apply across the whole bloc, meaning VAT between member states, data protection and the move to EU wide e-invoicing, are set out on Software Development Company for EU Businesses.

What Germany Companies Ask Us to Build

What German companies ask us to build, which splits between compliance work and the Mittelstand’s own systems.

Invoice Generation to the Standard

Producing XRechnung or ZUGFeRD from your own system, validated before it leaves, so a rejected invoice is caught by you before your customer sees it.

Receiving and Reading Incoming Invoices

Taking a structured invoice from a supplier and matching it to an order automatically, which is where the saving actually is.

Manufacturing and Production Systems

What a line produced, when it stopped and what it consumed, for the industrial businesses that make up much of this market.

Supplier and Dealer Portals

The companies either side of you working in one system instead of exchanging spreadsheets by email.

Warehouse and Logistics Tools

Receiving, picking and despatch recorded where the work happens, so the stock figure is right when somebody commits to a delivery.

Replacing Software That Cannot Be Extended

A system that works but cannot take the new requirement. We read it before saying whether to extend or replace.

Selected References

Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.

National Education Foundation

National Education Foundation

Education Foundation

Kurtsan

Kurtsan

Wheel Hub Industry

Floorwise

Floorwise

Commercial and Residential Flooring

Toptanfactory

Toptanfactory

Wholesale Marketplace

Structy

Structy

Civil Engineering

From First Call to Project Start

The same five steps wherever you are. You can stop after any of them.

1

Short Call

15 Minutes

You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.

2

Technical Review

45-60 Minutes

We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.

3

Scope Document

Before Any Contract

What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.

4

Build and Preview

From Week One

A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.

5

Handover and Support

On Completion

The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.

Choosing a Firm From Germany

What to settle before letting anybody touch the system that produces your invoices.

Validated Before It Is Sent

An invoice that fails the standard should fail on your side, with a clear reason, not arrive at a customer and come back a week later as a payment delay.

The Format Is a Setting

Specifications are revised. Which version you produce, and what each field is filled from, belongs where your own team can adjust it without a developer.

Your Tax Adviser Defines the Obligation

We build to what your Steuerberater tells us applies. We are software engineers and we say plainly where our competence stops.

We Read the Existing System First

Most of these projects involve software that already produces invoices. The review says whether it can carry the new format or whether it cannot.

The Server Is Opened in Your Name

In a region you choose, which for German clients is usually settled before anything else. You hold the billing and the keys.

One Engineer, Named in the Contract

Not a ticket queue. The person who read your system is the person who answers in month eight.

Questions German Clients Ask

The useful way to think about this deadline is that it is not really about invoices. A structured invoice is a statement that your system holds a specific set of facts in a specific shape, and most systems that have produced PDFs for years do not hold all of them. The customer reference that was typed into a free text line. The tax treatment that somebody knew from memory. Those gaps surface the first time an invoice is validated against the standard, and they take longer to fix than the export does. That is the argument for starting before the deadline rather than in December.

Other Countries We Write For in the European Union

A Fifteen-Minute Call Is Enough to Start

If your invoices are PDFs today, the gap is in the data, not in the export.

Get a Quote
© 2024-2026 Codefacture Yazılım A.Ş.All Rights Reserved
Get a Quote

We reply the same working day