You supply Western Europe, which means two sets of requirements meet inside one system.
A lot of Romanian business is supply. Components, assemblies, logistics and services sold into Germany, Italy, France and further. That puts two sets of requirements inside one system. The national electronic invoicing rules on this side, and whatever your customer in Munich or Milan demands on theirs, and the two were not designed with each other in mind.
What a supplier to Western Europe has to reconcile.
The parts that apply across the whole bloc, meaning VAT between member states, data protection and the move to EU wide e-invoicing, are set out on Software Development Company for EU Businesses.
What Romanian companies ask us to build.
Producing the required format, sending it and recording what came back, against the invoice instead of in a separate list.
What your Western European client requires to see, produced from the system instead of assembled each month.
What a line produced, when it stopped and what it consumed, for the manufacturing that drives this economy.
Which material went into which assembly and which customer received it, answerable in minutes when it is asked.
Loads, drivers and proof of delivery for operations running across the continent.
Software the business depends on that nobody can change. We read it before saying what should happen to it.
Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.
The same five steps wherever you are. You can stop after any of them.
You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.
We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.
What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.
A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.
The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.
What to settle before building for a business that supplies another country.
What your client audits you against goes into the scope document before the price is fixed. Discovered during an audit, it is the most expensive way to learn a requirement.
A second Western European client with different formats should be configuration and an afternoon, not a second project.
Including what the system prints and sends. Three languages designed in is ordinary work; three languages retrofitted is every screen again.
Where something already runs production or invoicing, the review says what is salvageable. The findings are yours either way.
In a region you choose, which is also the straightforward answer when a customer asks where their data sits.
Not a ticket queue. The person who read your system is the person who answers in month eight.
A supplier carries requirements it did not write. The national rules on one side, the customer contract on the other, and a business in the middle that has to satisfy both while competing on price. The expensive version of this is discovering one of those requirements during an audit, because by then the system has a year of records that were never captured in the required shape. The cheap version is bringing the customer contract to the first conversation, where it costs an hour and changes the scope rather than the budget.
Bring the contract your biggest customer holds you to. That is where the scope starts.
We reply the same working day