Engineering firms and public bodies, where the buyer answers to somebody who was not in the room.
Glasgow is Scotland’s manufacturing and engineering city, and it is also where a great deal of Scottish public spending is managed. Both of those produce the same kind of project. Somebody needs a system, somebody else approves it, and a third person will audit it in two years. What is built has to satisfy all three, and only the first one is on the call.
What shapes a Glasgow project from the start.
The parts that apply to the whole country, meaning the working hours, invoicing in pounds, VAT and where your data sits, are set out on Software Development Company for UK Businesses.
What Glasgow organisations ask us to build.
What was agreed, what has been delivered against it and what that entitles you to claim, with the evidence attached.
Jobs, materials, hours and costs, available while a job is still running rather than at the end of it.
What is on the floor, at what stage and what is waiting on something else, recorded where the work happens.
Systems for councils and agencies, with accessibility treated as a requirement from the first week.
What was checked, by whom and what was found, held against the asset so it survives a change of contractor.
Software the organisation depends on with nobody left who understands it. We read it before saying what should happen to it.
Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.
The same five steps wherever you are. You can stop after any of them.
You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.
We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.
What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.
A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.
The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.
What to settle before anybody commissions a system here.
Inclusions, exclusions, the fixed figure and the timeline, in language finance can follow without a technical briefing. If only the person we spoke to understands it, it is of no use.
On a contract measured in years, the original terms are referred back to constantly. They belong in the system and not in an attachment somebody has to find.
It decides the markup and the screens. Tested at the end, it becomes a rebuild of the front of the system against a deadline.
The review says what is worth keeping and what is not. The findings are yours whether or not you continue with us.
In a region you choose. You hold the billing and the keys, so leaving us moves nothing.
Not a ticket queue. The person who read your systems is the person who answers in month eight.
The scope document does more work in Glasgow than almost anywhere else we sell, because it is read by people who never speak to us. A technical sponsor who understands the project hands it to a finance director who wants to know what the number is and whether it moves, and then to somebody who will check in two years whether what was promised was delivered. A document written only for the first reader stalls at the second, and the project that stalls is usually not the one with the worse idea. It is the one with the worse document.
Tell us who has to approve it and we will write the document for them too.
We reply the same working day