For primary industry, where the season decides the deadline and nobody can move it.
Primary industry runs on a calendar nobody negotiates with. A harvest happens when it happens, a processing season opens and closes, and a system that is not ready misses a year rather than a deadline. That is a different kind of pressure from a commercial launch date, and it changes how a project should be planned.
What building for primary industry has to respect.
The parts that apply to the whole country, meaning the working hours, invoicing, GST and where your data sits, are set out on Software Development Company for New Zealand Businesses.
What Canterbury businesses ask us to build.
What came off which block, when, and in what condition, recorded as it happens instead of reconstructed afterwards.
Raw product in, finished product out, and the link between them held so a question about one batch can be answered quickly.
Temperature and handling held against the consignment, so the evidence exists when a customer or an auditor asks for it.
The records a supply programme requires, attached to the thing they describe instead of filed separately.
Jobs, costing and production for the engineering firms that supply this industry.
A system the business still runs on with nobody left who understands it. We read it before saying what should happen to it.
Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.
The same five steps wherever you are. You can stop after any of them.
You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.
We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.
What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.
A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.
The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.
What to settle before building anything that has to be ready for a season.
We say before the contract what fits before the season opens and what does not. Agreeing to a date we do not believe is how a system arrives for next year.
Properties and sites here often have none. The device holds the entry and uploads when service returns, and the screen says plainly which state it is in.
A reading held against the specific batch, not a note saying conditions were fine. The second is not evidence and an auditor will say so.
On an existing system nobody can price the work without opening it. The review produces findings you keep whether or not you continue with us.
Opened in your name, in a region you choose. You hold the billing and the keys, so leaving us moves nothing.
Not a ticket queue. The person who built it is the person who answers in month eight.
A season deadline deserves more honesty than a commercial one, because the consequence of missing it is so much larger. A launch that slips by three weeks is an inconvenience. A system that is not ready when a processing season opens is not used that year at all, and the business carries the cost of the build with none of the benefit until the following one. That is why we would rather agree a smaller first version that will certainly be ready than a complete one that probably will be.
Tell us when your season opens and we will plan backwards from it.
We reply the same working day