Queensland keeps its own time for half the year, and a system working across state lines has to know it.
Queensland does not move its clocks, and the southern states do. For five months of the year a Brisbane business booking something with Sydney is working across an hour it does not experience, inside its own country. Add a state large enough that a regional branch is a flight away and not a drive, and you have the two things that shape software here.
What a Queensland operation deals with that a southern one does not.
The parts that apply to the whole country, meaning the working hours, invoicing, GST and where your data sits, are set out on Software Development Company for Australian Businesses.
What Queensland businesses come to us for.
Head office and regional branches in one system, where a site a thousand kilometres away is not a second installation.
Harvest, yield, inputs and movements recorded on properties where the office is a long way from the work.
Crews travelling long distances, with what happened on each job coming back without a phone call.
Capacity, seasons and availability for operators whose year is concentrated into particular months.
What was completed on site and what it entitles you to claim, in an industry where weather routinely moves the programme.
A system the business depends on that nobody can change any more. We read it before saying what should happen to it.
Some of these have a case study that says what the problem was, how we built the system and what changed afterwards.
The same five steps wherever you are. You can stop after any of them.
You outline what you need and we ask enough to understand it. If this is not something we should be building, you hear that on the same call rather than after a scope document.
We go through the detail together. What the system has to do, who uses it, what already exists, where the data lives and what has to keep working while we build.
What will be built, what it costs and how long it takes, in writing. You read it before the contract, not after it.
A preview address goes up in the first week and everything built so far sits there in working form. You follow the application rather than a status report.
The source code, the server and the documentation are yours. Support terms, if you want them, are written into the contract with hours and a channel.
What to settle before building for an operation spread across this state.
Always, and shown in the reader’s own. The daylight saving difference with the south makes this a real source of error here rather than a theoretical one.
Much of this state has none. The device holds the entry and uploads when service returns, and the screen says plainly which state it is in.
Opening a branch next year should be a configuration your own office does. Where each site is a separate system, every change is made several times and drifts.
Where something already runs the operation, the review says what is salvageable. The findings are yours whether or not you continue with us.
Opened in your name, in a region you choose. You hold the billing and the keys, so leaving us moves nothing.
Not a ticket queue. The person who read your system is the person who answers in month eight.
The daylight saving difference is a small thing that produces a very particular kind of damage. For seven months a system that stores a bare local time behaves perfectly. Then the southern states move their clocks and every cross border booking, deadline and appointment is quietly an hour out, and because it was right until recently nobody suspects the system. The fix costs nothing when the system is designed and cannot be applied retrospectively with any confidence, because by then the data itself is ambiguous.
If you book anything with the southern states, raise the hour on the first call.
We reply the same working day